Quickly supply alternative strategic theme areas vis-a-vis B2C mindshare. Objectively repurpose stand-alone synergy via user-centric architectures.

FOLLOW US ON:

Get in touch!

Fusce varius, dolor tempor interdum tristiquei bibendum service life.

147/I, Green Road, Gulshan Avenue, Panthapath, Dhaka

Projects

airport runways

Airport Runways

Expansion works for Terminal 1 at Indira Gandhi International Airport (IGI Airport) with construction of Runway rigid pavement, Buildings of Phase 3A.

Read More
rcc drains

RCC Drains

Output and Performance based Road Contract (OPRC) for Improvement, Rehabilitation, Resurfacing Works and Network Performance of Roads: Dhandhuka-Dholera-, Dhandhuka- Paliyad and Limbdi-Dhandhuka

Read More
Highways Protection Work

Highways Protection Work

Access Controlled Nagpur-Mumbai Supercommunication Expressway (Maharashtra Samruddhi Mahamarg) Project in the state of Maharashtra on EPC Mode basis- From Vill Asta-Wadhona-amnathKm 89+300 to 162+667 PKG - III.

Read More
bridge works

Bridge Work

Widening and strengthening of existing two lane to four lane with paved side shoulders of Amritsar-Tarn Taran to Harike section of NH-15 from Km 112+575 to Km 158+500 in the state of Punjab on EPC Mode

Read More
Highways PQC Laying

Highways PQC Laying

Widening and Strengthening existing two lane to 4 lane with paved side shoulders of Koida – Rajamunda section of NH-215 (New NH-520) in the state of Odisha on Engineering Procurement and Construction (EPC) Mode

Read More